CSG Solar’s production is starting in March 2006 in its 9.000 square metre facility located in Thalheim, Saxony-Anhalt (Germany).
Erected in less than a year, optimized by a team of architects, builders and engineers bringing a large experience in the solar field, this state-of-the-art production plant will be the model for future growth in our industry.
CSG Solar’s production line will scale up in early 2006 to reach a capacity of 10-12 MW. By the end of 2006, the capacity will be doubled to 20-25 MW. The production department is designed to operate around the clock, 365 days a year in 4 shifts with a total of 80 people.